[dsg-hallb_rich] RICH II assembly OSP

Ed Folts folts at jlab.org
Mon Jan 24 10:47:49 EST 2022


Hi Marc
This was a very well done OSP.
Thanks
Ed

From: Marc Mcmullen <mcmullen at jlab.org>
Sent: Monday, January 24, 2022 10:18 AM
To: Patrizia Rossi <rossi at jlab.org>; Ed Folts <folts at jlab.org>; Bert Manzlak <manzlak at jlab.org>; Stepan Stepanyan <stepanya at jlab.org>
Cc: dsg-hallb_rich at jlab.org; Cynthia (Thia) Keppel <keppel at jlab.org>
Subject: RICH II assembly OSP

Good Morning Patrizia,

The RICH II assembly OSP<https://misportal.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=122990> has been reviewed by the SMEs  and is ready for final approval at the DSO, EHS&Q, and Hall B levels.

Final approval is need by either you or Ed for the DSO, Bert can sign for ESH&Q, and Stepan can sign for Hall B (also you or Thia could sign for Hall B as well).

Once signed I will have it printed and posted at the clean room.


Thanks for your attention in this matter,
Marc McMullen
Sr. Instrumentation Designer
Detector Support Group
(757) 269-7738

-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/dsg-hallb_rich/attachments/20220124/eeec5e12/attachment.html>


More information about the dsg-hallb_rich mailing list