Yes, but I'm not sure if there will be enough slack in the cable to cut off the old pin and crimp on a new one, but I'll at least try that.

If that doesn't work I'll just swap the HV patch panel boxes. The labeling will be wrong, but it will be the fastest way to get it up and running.

________________________________
From: Yuri Gotra <gotra at jlab.org>
Sent: Friday, April 9, 2021 11:47 AM
To: Brian Eng <beng at jlab.org>
Cc: dsg-hallb_svt at jlab.org <dsg-hallb_svt at jlab.org>
Subject: Re: CVT work


Thank you Brian,


I started R1. The main requirement is for the BMT to slide over the cables, we don't have much clearance so the cable bundles should be routed w/o crossing each other whenever possible. Tape and velcro will do too, I put a box of velcro in the cart.

For R1M10 on the HV patch panel, would it be possible to replace the connector by removing the 4 screws attaching it to the panel?

On 4/9/21 11:21 AM, Brian Eng wrote:
Yes, I'll be in tonight to start work on connecting cables on the detector side.

Two quick questions.
1) How neatly do these need to be run, i.e. can I just use velcro/tape to secure cables or should it be properly cable wrapped/routed?
2) Has anything been decided on the damaged HV patch panel connector?
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/dsg-hallb_svt/attachments/20210409/e56add37/attachment.html>


More information about the dsg-hallb_svt mailing list