[dsg-hallb_svt] Debugging SVT DAQ
Brian Eng
beng at jlab.org
Tue Apr 27 10:16:55 EDT 2021
I didn't change the chiller set points, but that ice was already built up as the bag was slightly peeled back.
I'm not sure the picture conveyed it very well, but the ice build up was fairly thick.
________________________________
From: Yuri Gotra <gotra at jlab.org>
Sent: Tuesday, April 27, 2021 8:11 AM
To: Brian Eng <beng at jlab.org>
Cc: Marco Battaglieri <battagli at jlab.org>; dsg-hallb_svt at jlab.org <dsg-hallb_svt at jlab.org>; Patrizia Rossi <rossi at jlab.org>
Subject: Re: [dsg-hallb_svt] Debugging SVT DAQ
Thank you for your help, Brian
A question about icing. Did you warm up the SVT for a few hours before opening the plastic bag? This was in the instructions I sent last week. The detector should be warmed up before any work on L1C. With nitrogen purging and the detector at RT there should be no condensation. After the work is done, the chiller should be set to the same temperature as before (currently -10 C).
On 4/27/21 1:51 AM, Brian Eng wrote:
Hi Yuri,
Here's what I've noticed so far with R1 M2.
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/dsg-hallb_svt/attachments/20210427/bc51d0f0/attachment.html>
More information about the dsg-hallb_svt
mailing list