[dsg-hallb_svt] Debugging SVT DAQ
Yuri Gotra
gotra at jlab.org
Tue Apr 27 16:39:13 EDT 2021
Hello Brian,
I am checking it. We would need to have the MFC connected to our
nitrogen purging line to control the flow remotely (Sergey already moved
it to 86 domain by your request) and ambient sensors (temperature and
humidity) to remotely monitor conditions in the clean room. Thank you
On 4/27/21 10:16 AM, Brian Eng wrote:
> I didn't change the chiller set points, but that ice was already built
> up as the bag was slightly peeled back.
>
> I'm not sure the picture conveyed it very well, but the ice build up
> was fairly thick.
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/dsg-hallb_svt/attachments/20210427/e93ec336/attachment.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: gotra.vcf
Type: text/x-vcard
Size: 102 bytes
Desc: not available
URL: <https://mailman.jlab.org/pipermail/dsg-hallb_svt/attachments/20210427/e93ec336/attachment.vcf>
More information about the dsg-hallb_svt
mailing list