[dsg-hallb_svt] CVT work
Yuri Gotra
gotra at jlab.org
Thu Mar 18 16:09:29 EDT 2021
We are trying to work it out. Valery said the will start RICH work no
sooner than end of May and will occupy first the small space. I am also
considering EEL125 for CVT commissioning which doesn't require the clean
room. What we need now is the patch panel and cables properly labeled,
HW interlock software tested with ambient sensors so that when we mount
the SVT on the cart and connect the SVT cooling and purging, we can use
it. I can have SVT warm for days but not weeks, the safety interlocks
should be operational and not affect the commissioning schedule. I do
not want a temporary solution like cRIO, all interlock software and
hardware should be the same which will be used in the hall.
On 3/18/21 3:57 PM, Brian Eng wrote:
> Has it been worked out where the CVT is going to be located? It wasn't
> clear to me if there was still issues with GEM moving out or not.
>
> I'm not going to be able to move racks/crates myself, but
> smaller/lighter things like patch panels I can.
>
> The cRIO has been tested and if things are in their place I can
> connect it tomorrow night. Or I could just move the patch panel to the
> cRIO and connect it there?
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/dsg-hallb_svt/attachments/20210318/e04b18bf/attachment.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: gotra.vcf
Type: text/x-vcard
Size: 102 bytes
Desc: not available
URL: <https://mailman.jlab.org/pipermail/dsg-hallb_svt/attachments/20210318/e04b18bf/attachment.vcf>
More information about the dsg-hallb_svt
mailing list