[Dsg-hallc_controls] Hall C NPS cable work for DSG
Jack Segal
segal at jlab.org
Tue Oct 29 16:56:06 EDT 2019
Fischer. The pin is a solder and the braid is a clamp.
On 10/29/2019 4:53 PM, Brad Sawatzky wrote:
> If we are still going with the Radiall connector (last information I
> had), then I also have set of HV crimp tools and a few connectors that
> arrived from the Glasgow group last week.
>
> -- Brad
>
> On Tue, 29 Oct 2019, Jack Segal wrote:
>
>> Thanks for the reminder. I have not heard of anything new. I was reminded to order the RG174/U cable. Just did. 2000 ft. in stock.
>> Should be in soon. I have the Molex connector and crimp tools on hand. I have the SMA connector on hand. The HV connector is past
>> due and I asked Jami to check on it. The example cable is on my desk in the EEL. I can bring it down and we can talk about how you
>> folks want to proceed at this point. I have not tried to assemble one of these.
>>
>> On 10/29/2019 12:47 PM, Peter Bonneau wrote:
>>> Hi Jack,
>>>
>>> We understand there is a delay for the NPS work in Hall C.
>>> If you could keep us in the loop regarding the new due date for this project, we'll be able to schedule the NPS cabling work in with our other DSG projects.
>>>
>>> Regards,
>>> Peter
>>>
>>
--
John(Jack) Segal
Halls A and C Spectrometer Support Manager
Thomas Jefferson National Accelerator Facility
12000 Jefferson Avenue
Suite 12
Newport News, VA 23606-4486
Phone: (757) 269-7242
Cell: (757) 320-9977
More information about the Dsg-hallc_controls
mailing list