[Dsg-hallc_nps] Chiller Availability
Julie Roche
jroche at jlab.org
Tue Apr 23 12:51:51 EDT 2024
Thank you all for thinking about our NPS chiller problem. The Hall C techs fixed the leak this morning. It did not leak for the 1/2 hour we observed the pipe. Hopefully, the fix will hold.
But just in case it doesn’t. We have one more month to go. So locating a possible spare would be a great piece of mind. Another important parameter to keep the temperature constant is the flow rate. Our NPS chiller has 4,3 gallons per minute. One would need something close (or higher).
Thanks!
Julie Roche
From: Brian Eng <beng at jlab.org>
Date: Tuesday, April 23, 2024 at 12:24 PM
To: Yuri Gotra <gotra at jlab.org>, Denny Insley <dinsley at jlab.org>
Cc: Mark Kevin Jones <jones at jlab.org>, Julie Roche <jroche at jlab.org>, Robert Michaels <rom at jlab.org>, Dsg-hallc_nps at jlab.org <dsg-hallc_nps at jlab.org>
Subject: Chiller Availability
Yuri/Denny,
The NPS experiment in Hall C has a chiller that has developed a leak, do you know if any of the chillers previously used for the SVT are available for them to temporarily use?
It has a 3 kW capacity (not sure how much of this is actually needed), only needs to maintain 20C so not a particularly low temperature requirement, and 0.1C stability (also not sure how stringent this is), which is why I thought maybe one of the older model SVT chillers could be used?
Thanks
Brian
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/dsg-hallc_nps/attachments/20240423/c46b80f4/attachment.html>
More information about the Dsg-hallc_nps
mailing list