Hi Julie et al.,

After discussing the Keysight issue during our group meeting this afternoon it was suggested that perhaps a UPS for the Keysight mainframe would help prevent problems in the future.
The UPS would need to be housed in the SHMS hut and we would need to have a long power cable run from the shielded area where the chillers are located into the SHMS hut.
Does this sound like something that would be possible?

Thanks,
Aaron