December 2024 Archives by subject
Starting: Mon Dec 2 08:55:25 EST 2024
Ending: Sat Dec 21 12:28:33 EST 2024
Messages: 32
- [Eicatjlab_admins] [EXTERNAL] Canceled: Cost & Schedule (SC6) Dry Run
Hoffman, Caitlin
- [Eicatjlab_admins] [EXTERNAL] Canceled: EIC-BNL / JLab Monthly Joint Admin Meeting
Sfakis (admin)
- [Eicatjlab_admins] [EXTERNAL] CLOSEOUT for Electron-Ion Collider CD-3B ESR Dipole Systems Requirements Review
Wahl, Jennifer
- [Eicatjlab_admins] [EXTERNAL] CLOSEOUT for Electron-Ion Collider CD-3B ESR Dipole Systems Requirements Review
Wahl, Jennifer
- [Eicatjlab_admins] [EXTERNAL] Dry Run - SC5 Infrastructure (resent with revised agenda)
Schoefer, Kristine
- [Eicatjlab_admins] [EXTERNAL] Dry Run - SC5 Infrastructure (resent with revised agenda)
Wahl, Jennifer
- [Eicatjlab_admins] [EXTERNAL] EIC/BNL HDR 60% Final Detailed Design Submittal Page Turn - DAY 1 (resent with detailed agenda)
Schoefer, Kristine
- [Eicatjlab_admins] [EXTERNAL] EIC/BNL HDR 60% Final Detailed Design Submittal Page Turn - DAY 2 (resent with detailed agenda)
Schoefer, Kristine
- [Eicatjlab_admins] [EXTERNAL] EIC Infrastructure / HDR - Value Engineering Study Monday, 1/27 - Friday, 1/31
Schoefer, Kristine
- [Eicatjlab_admins] [EXTERNAL] EIC Infrastructure 60% Detailed Design deliverables
Wahl, Jennifer
- [Eicatjlab_admins] [EXTERNAL] Electron-Ion Collider CD-3B ESR Dipole Requirements Review
Wahl, Jennifer
- [Eicatjlab_admins] [EXTERNAL] Electron-Ion Collider CD-3B ESR Dipole Requirements Review
Schoefer, Kristine
- [Eicatjlab_admins] [EXTERNAL] Electron-Ion Collider CD-3B ESR Dipole Systems Requirements Review
Schoefer, Kristine
- [Eicatjlab_admins] [EXTERNAL] Electron-Ion Collider CD-3B ESR Dipole Systems Requirements Review
Wahl, Jennifer
- [Eicatjlab_admins] [EXTERNAL] Meeting to resume at 1pm today RE: EIC/BNL HDR 60% Final Detailed Design Submittal Page Turn - DAY 2 (resent with detailed agenda)
Schoefer, Kristine
- [Eicatjlab_admins] [EXTERNAL] RE: Cost & Schedule (SC6) Dry Run
Krug, Kelly
- [Eicatjlab_admins] [EXTERNAL] RE: EIC-BNL / JLab Monthly Joint Admin Meeting
Hoffman, Caitlin
- [Eicatjlab_admins] [EXTERNAL] Recordings and Transcripts Available: EIC/BNL HDR 60% Final Detailed Design Submittal Page Turns
Schoefer, Kristine
- [Eicatjlab_admins] [EXTERNAL] Reminder: Comments Due Date on HDR 60% Detailed Design Submittal (EIC Infrastructure, CAD, F&O and MPO)
Schoefer, Kristine
- [Eicatjlab_admins] [EXTERNAL] Reminder: Comments Due Date on HDR 60% Detailed Design Submittal (EIC Technical Systems Division)
Schoefer, Kristine
- [Eicatjlab_admins] [EXTERNAL] S6 & SC7 DRY RUN - EIC DOE OPA CD-3B Review
Thelen, Mary Ellen
- [Eicatjlab_admins] [EXTERNAL] Save the Date: EIC/HDR Reconciliation Meeting / Kick Off 90% Final Detailed Design - DAY 1
Schoefer, Kristine
- [Eicatjlab_admins] [EXTERNAL] Save the Date: EIC/HDR Reconciliation Meeting / Kick Off 90% Final Detailed Design - DAY 2
Schoefer, Kristine
- [Eicatjlab_admins] EIC at JLab CAM List Update - Folks who need CAM Training
Christine Fragapane
- [Eicatjlab_admins] EIC at JLab CAM List Update - Folks who need CAM Training
Katherine Wilson
- [Eicatjlab_admins] Fw: EIC-TJ Site Office 1-pager for November
Katherine Wilson
- [Eicatjlab_admins] PLI
Christine Fragapane
- [Eicatjlab_admins] Searching for documents of second IR
Christine Fragapane
- [Eicatjlab_admins] Travel Form Notification
Christine Fragapane
- [Eicatjlab_admins] Travel Form Notification
Christine Fragapane
- [Eicatjlab_admins] Travel Form Notification
Christine Fragapane
- [Eicatjlab_admins] Travel Form Notification
Christine Fragapane
Last message date:
Sat Dec 21 12:28:33 EST 2024
Archived on: Sat Dec 21 12:28:38 EST 2024
This archive was generated by
Pipermail 0.09 (Mailman edition).