Hall A Meeting Minutes
9 August 2011
Attendance: Bob, Jaiver, Ed, Jessie, Kees, Robin, Sirish, Bogdan,
Karl, Jixie, Ole, Larry, Albert, Bert
Bert reminds everyone who is working in the Hall to make sure that they have
taken the six month down Hall work governance training SAF110-KD:
http://www.jlab.org/div_dept/train/Knowledge_Docs/install_governance_5-1.pdf
Robin reports designers working on final g2p items: 3rd arm supports &
shielding and camera support & viewers. There was discussion if a field map
would be needed of the septum magnet. Likely a course map should be done,
though it will require an operational safety procedure (OSP).
Douglas reports that the Hall A SRC results were shown as an explanation for
the recent discrepancy between neutrino cross section measurements and simple
calculations which had neglected correlations.
(see http://hallaweb.jlab.org/talks/2011/ )
Jack report that we should be able to have three fastbus creates in each arm
during the next run period.
Bogdan checked the gas Cherenkov and the mirrors were ok; in looking further
found that their was an analysis problem. Also reports getting ready for PAC
and GEM detector test at Mainz.
Jixie simulated 3rd arm for g2p and found 30cm plastic shielding is required.
Ole has computer upgrades coming to the counting house. He will install 64bit
OS and provide 20 TB of local storage.