[Halla_min] Hall A Minutes (1/15/2013)
John LeRose
lerose at jlab.org
Thu Jan 17 11:01:47 EST 2013
Please see: http://hallaweb.jlab.org/news/minutes/minlinks.html
--
-JJL
John J. LeRose
Thomas Jefferson National Accelerator Facility
12000 Jefferson Ave.
Suite 4, MS 12H3
Newport News, Va. 23606
-------------- next part --------------
Minutes of Hall A Group Meeting January 15, 2013
1) Thia Keppel
a) Report from senior staff meeting:
i) Re new system replacing webstock, keep an eye out for
companies that are missing. Send information to Rolf
(ent at jlab.org)
(1) Ole outlines a problem with changing prices in the
system and the time lag between submission and final
approval (by the time you get approval the price has
changed and you have to start over)
ii) SBS monthly report to go out to DOE today. This with a
phone call will, we hope, constitute a quarterly report.
iii) Performance appraisal process continues
iv) CHL: corrosion in an LCW pipe underneath the CHL is
causing a leak and must be repaired. This will likely
cause some delays (shouldn?t directly affect Hall A)
v) OSHSA surveillance audit last week went well
vi) Safety Fair went well
vii) NSAC sub-committee did not send in their report on the
7th as scheduled
viii) NSAC 10-year Facilities Plan meeting is in mid-
February
ix) DOE budget briefing:
(1) Offered the minimum viable number
(2) The lab is pushing back
(3) Research funding considering 2 scenarios, cost of
living and flat.
(4) Expect some small cuts in 2014 (no change in
philosophy)
x) Friday (1/11) there was a meeting to discuss the Directors
ETC (Estimate to Complete) review for 12 GeV
(1) Cost and schedule variances are large
(2) 12 GeV structural change, Claus is out of the
magnet business, Glenn has the magnets and Dave Mack is
his helper, 2 new magnet engineers have been hired
xi) Review for powering Hall D Solenoid went well.
xii) Counting House renovation: They have decided they need
to do some welding under the roof. The second floor must
be cleared of everything to reduce fire hazard. If you
have anything there get it out.
xiii) Chris Cuevas is hosting a visit from CAEN of some
engineers to demonstrate new equipment , tomorrow (1/16)
from 10 to noon
b) GMp collaboration meeting tomorrow (1/16) at 14:00
c) Get your list of publications and awards to Stephanie ASAP
2) Robin Wines
a) DVCS/GMp:
i) Shielding drawings ongoing
ii) Wire target is in Dave Meekins hands for review and
possible revisions
b) SBS:
i) Working on magnet iron modifications and coil designs
ii) Continuing with Cherenkov work
3) Ed Folts
a) Møller Quads are back on the beamline and aligned
b) Entrance beam girder aligned
c) Aligning beamline components
d) Left collimator installed (other to go in tomorrow)
e) DVCS stand modifications underway, almost done
f) Working on new shield hut for the raster
g) There is a leak in the Hall at the AC penetration in the
roof. Pushing work requests for repair. Plant services came
to have a look this morning.
4) Bert Manzlak
a) Re the OSHSA surveillance audit (OSAS), that refers to an
international safety certification that happens every 6
months
b) Reiterate the need for documentation for all work/test
setups. (Alist, OSP, TOSP, Laser Safety OSP, etc.) Contact
Bert for assistance (Manzlak at jlab.org)
5) Bogdan Wojtsekhowski gives presentation about Septa for the HRS
a) See
http://hallaweb.jlab.org/news/minutes/RC_Summaries/Septa-
for-APEX.pdf
-JJL
More information about the Halla_min
mailing list