[Halla_min] Weekly Minutes 2-11-14
Stephanie Tysor
stysor at jlab.org
Fri Feb 14 14:49:28 EST 2014
Minutes of Hall A Group Meeting: February 11, 2014
1)Thia Keppel
a.From Senior Staff Meeting:
i.Open House will be May 17, 2014
ii.Open enrollment for benefits starts this week
b.Budget discussed, FY14 and beyond
i.Budget will probably come in quarterly
ii.Budget hasn't trickled down to Physics and the halls yet, but expect
very soon
iii.Looks good for rest of this year, what was requested
iv.Long-term budget is dismal
v.Lab still in process with DOE, hope to get more in line with Tribble
sub-committee
c.Accelerator reached 2.2 GeV/pass milestone
i.still has lots of trips and not physics quality at this energy -- but
an achievement nonetheless!
d.Post Doc search committee (same as before, Doug to Chair) will start
to review applicants
e.Need final DOE approval before Hall A can get beam, but we have now
completed all required tasks for documentation/review responses
2)Robin Wines
a.Compton polarimeter -- detector can put in the machine shop for
modifications
i.Expect to be finished by end of February
b.DVCS/GMp -- floor plates delivered
c.SBS
i.Racetrack vendor agreed to contract reduction
ii.Conductor to be delivered to them March 3^rd
iii.They will give us their coil delivery schedule update once conductor
is received
iv.Revising saddle coil drawings to meet Bogdan's new requirements
v.Plan to award saddle coils in March
vi.Magnet support structure -- present designs too expensive, reviewing
and modifying to reduce cost
vii.Continue to work on magnet assembly to incorporate changes and
develop assembly procedure
viii.Magnet steel picked up by vendor on Tuesday
d.APEX
i.Defined shielding support and corrector costs
e.SoLID
i.Provided some details on structure for the report
ii.Still need a few more days to complete this work
f.Whit started magnet cool down training, working with Ed and Heidi to
learn magnet system
g.Grinch
i.Continuing design work for W&M
3)Ed Folts
a.Cryo troubleshooting, continue HRS cool down, proceeding as expected
b.Cryo training
c.Installed windows on target chamber downstream extension
d.Compton detector can is in machine shop
e.No survey this week
f.Floor plate delivery, discussion on 0.3 vs 0.5 for angle increments
g.New short snouts to accommodate farrow arm are almost finished, still
waiting for gasket material
h.Ready to drill holes for jib crane when target group is finished with
manlift
4)Jack Segal
a.Supporting Ed
b.Cleaned up dump resisters on dipoles
c.Change connectors on cables
5)Bert Manzlak
a.Telephones in Counting House on the 1^st floor will be operational
next week
b.Running copper to phone lines
c.Phones are a work in progress
6)Albert Shahinyan
a.HRS Detector Preparation talk, available on web at:
http://hallaweb.jlab.org/news/talks/2014-02-11_Shahinyan.pptx
JLab Notable Events
link:**https://www.jlab.org/div_dept/dir_off/oa/notable/index.html
-------------- next part --------------
An HTML attachment was scrubbed...
URL: https://mailman.jlab.org/pipermail/halla_min/attachments/20140214/d69e9b1e/attachment-0001.html
-------------- next part --------------
A non-text attachment was scrubbed...
Name: stysor.vcf
Type: text/x-vcard
Size: 356 bytes
Desc: not available
Url : https://mailman.jlab.org/pipermail/halla_min/attachments/20140214/d69e9b1e/attachment-0001.vcf
More information about the Halla_min
mailing list