Minutes of Hall A Group Meeting: February 5, 2019
1. Thia Keppel
a. Senior Staff
i. 3/11 NP on the Hill Day
ii. 3/18 - 3/22 "HOW 2019" HEP Software Foundation
iii. 4/1 - 4/3 JLEIC Collaboration (accelerator) meeting
iv. 4/24 - 4/26 MOLLER Director's Review
v. Next week
1. Open enrollment for benefits changes
vi. Avalanche of funds going to Quantum Information Systems
1. FOA for $10M coming in April
vii. Pay attention to Weekly Briefs!
1. "Fluff" sometimes will re-order/improve
2. Supposed to inform staff, total time reporting meeting dates are in there, there are a couple left....check them out
viii. RFP for nuclear femtography center proposals out
1. 2/15 due date
ix. Accelerator.....Friday beam is "wishful thinking", still touch & go with energy gradient
x. CEBAF Center Renovation (~$60M) to start next year
1. No cubicles for Physics staff
2. Office sizes ~ the same
3. Authorized FY20 funding, work 2021
xi. Test Lab & Annex - total may be raised to include
1. Technical support building $ EEL renovation, trying for expansion
xii. ESR2 - Cryo group assigned manager (Dana Arenius), engineers, project is moving
xiii. EIC
1. JLEIC converging on 100 GeV design
2. MC event generator (ep,eA) workshop in Hamburg - Feb.
3. Working on a ~ 2 week visitor program here at the lab
b. Hall News
i. Collaboration meetings - really nice to see all the activity!
2. Robin Wines
a. PREX2/CREX
i. Concrete shielding in procurement
ii. Sieve, sieve holder and sieve remote motion device in shop for fabrication
iii. Ordering material for Q1 sieves
iv. Ordering bellows for downstream of gate valve
v. Jessie ordering gate valve
vi. Completing drawing of target support plates
vii. Plastic shielding in shop to be modified
b. SBS
i. Working on CDet support and modifications
ii. Putting drawings together to order vertical beam line supports
iii. Working on drawings for BB electronics frame
c. MOLLER
i. Supporting efforts for shielding costs and magnet design
d. SoLID
i. Reviewing gas system plans
3. Jessie Butler
a. Continue working on APEX installation
b. Spent most of the week doing final checks throughout the hall in preparation for beam
c. Started on final hall clean up by moving unnecessary equipment out of the hall & into Physics Storage & building 98
d. Completed final checks of the vacuum & cryo system
e. Installed radiation boundary fence
f. Repaired a LCW leak on APEX septum
g. Installed LWC line on APEX power supply
h. Worked with Silviu to adjust 2 positioning switches on target ladder
i. Helped Ethan with cooling down Moller polarimetry solenoid
Stephanie Tysor
Thomas Jefferson National Accelerator Facility
Physics Division
Hall A Administrative Assistant
(office)757-269-6005<callto:757-269-6005> (fax)757-269-5235<callto:757-269-5235>
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/halla_min/attachments/20190208/8c6ef287/attachment-0001.html>
More information about the Halla_min
mailing list