[Halla_min] Minutes of Hall A Group Meeting: February 5, 2019

Stephanie Tysor stysor at jlab.org
Fri Feb 8 09:28:08 EST 2019


Minutes of Hall A Group Meeting: February 5, 2019


1.      Thia Keppel

a.       Senior Staff

                                                              i.      3/11 NP on the Hill Day

                                                            ii.      3/18 - 3/22 "HOW 2019" HEP Software Foundation

                                                          iii.      4/1 - 4/3 JLEIC Collaboration (accelerator) meeting

                                                          iv.      4/24 - 4/26 MOLLER Director's Review

                                                            v.      Next week

1.      Open enrollment for benefits changes

                                                          vi.      Avalanche of funds going to Quantum Information Systems

1.      FOA for $10M coming in April

                                                        vii.      Pay attention to Weekly Briefs!

1.      "Fluff" sometimes will re-order/improve

2.      Supposed to inform staff, total time reporting meeting dates are in there, there are a couple left....check them out

                                                      viii.      RFP for nuclear femtography center proposals out

1.      2/15 due date

                                                          ix.      Accelerator.....Friday beam is "wishful thinking", still touch & go with energy gradient

                                                            x.      CEBAF Center Renovation (~$60M) to start next year

1.      No cubicles for Physics staff

2.      Office sizes ~ the same

3.      Authorized FY20 funding, work 2021

                                                          xi.      Test Lab & Annex - total may be raised to include

1.      Technical support building $ EEL renovation, trying for expansion

                                                        xii.      ESR2 - Cryo group assigned manager (Dana Arenius), engineers, project is moving

                                                      xiii.      EIC

1.      JLEIC converging on 100 GeV design

2.      MC event generator (ep,eA) workshop in Hamburg - Feb.

3.      Working on a ~ 2 week visitor program here at the lab

b.      Hall News

                                                              i.      Collaboration meetings - really nice to see all the activity!



2.      Robin Wines

a.       PREX2/CREX

                                                              i.      Concrete shielding in procurement

                                                            ii.      Sieve, sieve holder and sieve remote motion device in shop for fabrication

                                                          iii.      Ordering material for Q1 sieves

                                                          iv.      Ordering bellows for downstream of gate valve

                                                            v.      Jessie ordering gate valve

                                                          vi.      Completing drawing of target support plates

                                                        vii.      Plastic shielding in shop to be modified

b.      SBS

                                                              i.      Working on CDet support and modifications

                                                            ii.      Putting drawings together to order vertical beam line supports

                                                          iii.      Working on drawings for BB electronics frame

c.       MOLLER

                                                              i.      Supporting efforts for shielding costs and magnet design

d.      SoLID

                                                              i.      Reviewing gas system plans



3.      Jessie Butler

a.       Continue working on APEX installation

b.      Spent most of the week doing final checks throughout the hall in preparation for beam

c.       Started on final hall clean up by moving unnecessary equipment out of the hall & into Physics Storage & building 98

d.      Completed final checks of the vacuum & cryo system

e.       Installed radiation boundary fence

f.        Repaired a LCW leak on APEX septum

g.      Installed LWC line on APEX power supply

h.      Worked with Silviu to adjust 2 positioning switches on target ladder

i.        Helped Ethan with cooling down Moller polarimetry solenoid



Stephanie Tysor
Thomas Jefferson National Accelerator Facility
Physics Division
Hall A Administrative Assistant
(office)757-269-6005<callto:757-269-6005> (fax)757-269-5235<callto:757-269-5235>

-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/halla_min/attachments/20190208/8c6ef287/attachment-0001.html>


More information about the Halla_min mailing list