[Halla_running] [New Logentry] RC Status update (Sunday)

brads at jlab.org brads at jlab.org
Sun Feb 7 12:05:02 EST 2016


Logentry Text:
--
<p><strong>Hall A Senior Staff / System owners:  Please read the punchlist below.  If
your system is on the list then please follow up with your students/post-docs
<em>TODAY</em> and generate a plan to understand/fix the problem.</strong>
</p>
<hr/>
<strong>Exec summary</strong>
<hr/>

<ul>
  <li><strong>NOTE: As we have started taking beam it is <em>CRITICAL</em> that no one
  modifies/tests/perturbs any production system (DAQ, BCM, Raster signals,
  detector, trigger control files, prescales, etc...) without consulting
  experts and <u>always</u> making a halog entry.</strong>
  <ul>
    <li>Please leave all Counting House shift computers in a clean state for
    the next shift crew (No non-mission-critical web browsers, PDF files,
    terminal windows cluttering screens, etc.)
  </li></ul>
  </li><li>Hall has been in Beam Permit since Friday OWL
  <ul>
    <li>Beam has been intermittent as MCC chases accelerator problems, and as they
    work on steering up 3-hall operation
    </li><li>There was a cold-box (cryo) trip mid-OWL shift.  Recovery is ongoing.
    <ul>
      <li>Earliest beam is likely to be restored is mid- to late-DAY shift
    </li></ul>
  </li></ul>
  </li><li>Significant issues pending (Systems Owners Attn Required!)
  <ul>
    <li>We have been unable to steer through the 1cm ID "Raster Target" hole
    without seeing rate spikes in the HRSs.
    </li><li>We have not been able to image the Carbon Hole target.
    <ul>
      <li>Part of this problem was due to broken, miscalibrated software on our
      end (spot++, etc).  There are questions about whether the raster is
      working correctly too...
    </li></ul>
    </li><li>Raster and BPM confusion (questions about hardware and software status)
  </li></ul>
  </li><li>BCM calibration should happen today (Sunday) during DAY/SWING
  <ul>
    <li>We plan to call senior experts immediately if this plan runs into snags
    (Mack, Alex)
    </li><li>We have the go-ahead to do a 'rough' BCM calibration up to 30--40uA
    <ul>
      <li>No target (ie. Home position)
      </li><li>Don't spend much time pressing the higher currents, the machine isn't
      very stable yet.  Just set the high-limit to the point that the machine
      will allow for now.
    </li></ul>
  </li></ul>
  </li><li>more details below...
</li></ul>
<hr/>
<strong>Hall Punchlist</strong>
<hr/>

<ul>
  <li>Everyone needs to read and sign the COO/ESAD/RSAD in the Counting House
  <ul>
    <li>See also <a href="https://logbooks.jlab.org/entry/3375013">https://logbooks.jlab.org/entry/3375013</a>
  </li></ul>
  </li><li>Harp scanners look generally OK, a couple of problems though
  <ul>
    <li>See <a href="https://logbooks.jlab.org/entry/3376480">https://logbooks.jlab.org/entry/3376480</a>
    </li><li>1H00 is strange, 1C17 is <em>not</em> working.  Both need to be looked at Monday.
  </li></ul>
  </li><li>Raster issues/questions
  <ul>
    <li>Raster scope disappeared from middle room in Counting House
    <ul>
      <li>how do we visually monitor the raster currents now?
      </li><li>more updates to shift 'howtos' needed if scope is gone for good
    </li></ul>
    </li><li>New Raster offset attenuators installed, made no difference(?) [Barak]
    </li><li>Possible swapping of raster signal to DAQ mapping [Barak]
    <ul>
      <li><a href="https://logbooks.jlab.org/entry/3375810">https://logbooks.jlab.org/entry/3375810</a>
    </li></ul>
  </li></ul>
  </li><li>Position, Energy, Current locks (and FFB) status unclear [MCC, Brad]
  <ul>
    <li>MCC still working on it (reminded them again this morning)
  </li></ul>
  </li><li>We have been unable to steer through the 1cm ID "Raster Target" hole
  without seeing rate spikes in the HRSs.
  <ul>
    <li>Many halog entries associated with this issue
    </li><li>It is unclear if this is beam optics (halo, strange launch angle to
    target, etc).  We have a plan in place to investigate further when beam
    returns today.
    <ul>
      <li>Can someone look at <a href="https://logbooks.jlab.org/entry/3376314">https://logbooks.jlab.org/entry/3376314</a> and estimate
      beam angle and postion on target from the 1H04A/B Harp wire readouts?
    </li></ul>
  </li></ul>
  </li><li>We have not been able to image the Carbon Hole target.
  <ul>
    <li>Part of this problem was due to broken, miscalibrated software on our
    end (spot++, etc).  There are questions about whether the raster is
    working correctly too...
    </li><li>The DVCS LHRS trigger blows out the file size so we are limited to 36k
    events before the file splits and spot++ can not deal with the split
    file.  We have been switched back to the DVCS trigger from the HRS only
    config, but I really do not understand why we have to deal with this
    complication right now...
  </li></ul>
  </li><li>Raster and BPM confusion (questions about hardware and software status)
  <ul>
    <li>See <a href="https://logbooks.jlab.org/entry/3376318">https://logbooks.jlab.org/entry/3376318</a> (this may be fixed now?)
    </li><li>Still strange:
    <ul>
      <li><a href="https://logbooks.jlab.org/entry/3376489">https://logbooks.jlab.org/entry/3376489</a>
      </li><li><a href="https://logbooks.jlab.org/entry/3376275">https://logbooks.jlab.org/entry/3376275</a>
    </li></ul>
  </li></ul>
  </li><li>"Suspicious activity of VDC and straw chamber in LHRS"
  <ul>
    <li><a href="https://logbooks.jlab.org/entry/3376348">https://logbooks.jlab.org/entry/3376348</a>
  </li></ul>
  </li><li>"Hall A General Tools" current readback 'hac_bcm_average' seemed to be off
  by a factor of 5 from the haHallA_beam_current and 0L02 readbacks during
  OWL.  Calibration changed/broken?
  </li><li>We plan to move the LRHS to 25 degrees first thing Monday and then
  get it surveyed during Beam Studies on Tuesday [Brad]
  </li><li>Arc scanner needs to be greased/oiled [Doug]
  <ul>
    <li>motion does work though, just makes a bad noise...
  </li></ul>
  </li><li>Arc Scanner Harp controls [new screen] does not work
  </li><li>Old (1 MHz) D1 BCM seems to drift, not clear if this is a serious problem or
  if the drift is just below the region of relevance for that (high-current)
  readback.  [Kijun, Mack, et al]
  </li><li>Need to verify that the alarm handlers all make noise (ie. audible alarm)
  <ul>
    <li>LeCroy HV controls [Kijun]
    </li><li>Target ALH
    </li><li>Hall A general ALH
  </li></ul>
  </li><li>CODA EPICS logging still has a few missing/dead variables(?) [Alex, et al]
  </li><li>An updated Hall A BCM average current screen that uses the new BCM readouts
  has been requested, OPS/SW working on it [Brad, Kjeldsen, Alex]
  </li><li>RHRS dipole showing some puzzling readbacks
  <ul>
    <li>It's OK at 0.75 GeV, but we should not change momentum without talking to Jack
  </li></ul>
  </li><li>Significant issue with Moller target [Sasha, Roman]
  <ul>
    <li>target position/angle shifts when magnet ramped up, can not maintain alignment
    </li><li>troubleshooting should be pursued during Friday DAY shift and have plan
    ready for follow up during planned downtime on Mon/Tues
  </li></ul>
</li></ul>
<hr/>
<strong>Completed Punchlist Items (new)</strong>
<hr/>
- A few Shift Checklist and documentation issues have been corrected [Julie]
- Right VDC gas flows not showing up on General Tools screen [Jack, Fixed]
- 103 kHz clock needs to be plugged into the DVCS DAQ at next access [Alex, Done]
- HRS Magnet issues solved (mostly)! [Segal]
<ul>
  <li>See <a href="https://logbooks.jlab.org/entry/3375822">https://logbooks.jlab.org/entry/3375822</a>
  </li><li>Left Q1 has limit of 1800A, but <em>stay below 1600A</em> for time being
  <ul>
    <li>We need to ensure shift crew have appropriate instructions on how to set
      the LHRS momentum correctly given this limitation.
  </li></ul>
  </li><li>Right Q1 <em>is</em> working: 800 A software limit
  </li><li>RHRS should stay at 0.75GeV for now
- BCM readouts are reported to be working [Alex, Musson, Mack, Ciprian]
  </li><li>need to keep an eye on this though...
</li></ul>
<hr/>
<strong>Tentative plan for the near term -- detailed daily runplans to come</strong>
<hr/>
2-pass beam to Hall A over this weekend and we'll scratch the Compton Chicane
requirement (just go straight through).  See below for more details. As usual,
the farther in the future, the fuzzier the forecast...

<p><u>Sunday DAY -- Monday OWL</u>
</p>
<ul>
  <li>2-pass beam, NO Compton chicane
  </li><li>See also: <a href="https://logbooks.jlab.org/entry/3375847">https://logbooks.jlab.org/entry/3375847</a>
  </li><li>Initial RHRS settings: P0 = 0.75 GeV/c, Angle = 48.75
  <ul>
    <li>Do NOT change the RHRS setting without contacting RC
  </li></ul>
  </li><li>Initial LHRS settings: P0 = 1.4  GeV/c, Angle = 38.64
  </li><li>Sieve plates:  OFF
  </li><li>Tasks will include (see <a href="https://hallaweb.jlab.org/wiki/index.php/Beamline">https://hallaweb.jlab.org/wiki/index.php/Beamline</a> )
  <ul>
    <li>Establish energy, position and current locks (and FFB) [MCC]
    </li><li>Beam centering and BPM/Raster checks
    </li><li>BPM calibration vs Harps ("Bull's Eye Scan")
    </li><li>Rough BCM calibration (cross calibration Hall A BCMs vs Unser only, no FC2; non-invasive to other Halls)
    </li><li>Start detector checkout and calibration studies
    <ul>
      <li>LHRS / DVCS checkout
      </li><li>RHRS checkout: 
      <a href="https://hallaweb.jlab.org/wiki/index.php/HRS_Checkout_%28Experts%29">https://hallaweb.jlab.org/wiki/index.php/HRS_Checkout_%28Experts%29</a>
      <a href="https://hallaweb.jlab.org/wiki/index.php/HRS_Detector_Calibrations">https://hallaweb.jlab.org/wiki/index.php/HRS_Detector_Calibrations</a>
    </li></ul>
    </li><li>ARC energy measurement [Doug]
    </li><li>Set LHRS DAQ to readout FADC in LHRS (low priority)
    </li><li>...
  </li></ul>
</li></ul>
<p><u>Monday DAY</u>
</p>
<ul>
  <li>Hall A will go to Restricted Access for target cooldown
  </li><li>Move LHRS to 25 degrees
  </li><li>Sieve plates will be ready to install, but talk to RC <em>before</em> putting them on
  </li><li>We will come back up at 1-pass after the target is cold
  <ul>
    <li>NO Compton chicane needed here either
  </li></ul>
</li></ul>
<p><u>Monday SWING --> for a few good integrated shifts</u>
</p>
<ul>
  <li>Run 1-pass CW beam
  </li><li>Sieve plates need to be on the RHRS for optics calibration
  </li><li>complete any critical beamline commissioning tasks that were not completed
  over the weekend
  </li><li>Run GMp optics calibrations studies (priority task)
  <ul>
    <li><a href="https://hallaweb.jlab.org/wiki/index.php/Spectrometer_Optics_First_pass_48p8d">https://hallaweb.jlab.org/wiki/index.php/Spectrometer_Optics_First_pass_48p8d</a>
  </li></ul>
  </li><li>...
</li></ul>
<p><u>Tuesday DAY: Beam Studies</u>
</p>
<ul>
  <li>MCC has 8 hours of Beam Studies during DAY shift
  </li><li>Survey group will come in to measure the LHRS (at 25 degrees)
  <ul>
    <li>ask to survey center hole on Sieve plate, if possible
  </li></ul>
  </li><li><em>IF 1-pass optics work is completed, then we will come back up at 2-pass,
  otherwise stay at 1-pass and complete optics work</em>
</li></ul>
<p><u>Wednesday DAY --> Weekend</u>
</p>
<ul>
  <li>Pass change to 2-pass (if not already done)
  <ul>
    <li>move the RHRS to largest angle (~55 degrees), so DVCS calorimeter can
    reach 20 degrees
    </li><li>go THROUGH the Compton Chicane this time
    </li><li>Yves and Compton experts (Gaskell) need to be on-shift during steer up to
    make sure the Compton is threaded well
  </li></ul>
  </li><li>Run 2-pass production quality beam
  </li><li>Complete remaining DVCS calibration tasks and/or pending beamline
  commissioning tasks
  </li><li>Possible Moller commissioning and/or dedicated Compton Commissioning
  </li><li>Get the 2-pass DVCS production data in the can
</li></ul>


---

This is a plain text email for clients that cannot display HTML.  The full logentry can be found online at https://logbooks.jlab.org/entry/3376493
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/halla_running/attachments/20160207/0c163731/attachment-0001.html>


More information about the Halla_running mailing list