[Hallb-engineering] switching power to IOC
Doug Tilles
tilles at jlab.org
Mon Dec 20 11:26:37 EST 2010
On 12/20/2010 11:16 AM, David Kashy wrote:
> Our buffer dewar and torus are backed up by the generator(s). Thus we
> should be able to run through the down time.
>
> I like Krister's suggestion to test the generator. Doug, can you get
> this done? If this is really just a short down, I too don't see why
> this can't be done during a normal business day. But maybe we don't
> have the full picture...
>
> I'll be out of town until the 29th, but may be reachable by cell phone
> if there is service in northern Michigan.
>
> Dave
>
>
>
>
> On 12/20/2010 10:39 AM, Doug Tilles wrote:
>> Sergey,
>> I just heard that hall A is going to switch to dirty power for there
>> cryo controls due to the power shut down over the break. Can this also
>> be done for our systems?
>>
>>
>> _______________________________________________
>> Hallb-engineering mailing list
>> Hallb-engineering at jlab.org
>> https://mailman.jlab.org/mailman/listinfo/hallb-engineering
I'm getting in touch with Paul Powers now to set up a test with Harris
Elec on the Generator. Doug
More information about the Hallb-engineering
mailing list