[Hallb-engineering] Fwd: Hall B Power Outage
Doug Tilles
tilles at jlab.org
Tue Oct 25 09:19:09 EDT 2011
On 10/25/2011 9:04 AM, David Kashy wrote:
> Volker,
>
Good idea. I also need to do a survey of all of the exit lights as well
as emergency light's Doug
> I have no problem with this.
> We will probably have to cancel the Hall B engineering meeting, to
> allow the techs to help recover if there are problems with recovery.
>
> Doug, George and Krister,
> What do you think?
>
> Dave
>
>
> On 10/25/2011 7:02 AM, burkert wrote:
>> Hi all,
>>
>> Does anyone have objections as to the date and time when the utility
>> power will be killed for
>> the HDIce emergency power test?
>>
>> Volker
>>
>>
>>
>> -------- Original Message --------
>> Subject: Hall B Power Outage
>> Date: Mon, 24 Oct 2011 15:50:17 -0400
>> From: Paul Powers <powersp at jlab.org>
>> To: Doug Tilles <tilles at jlab.org>, David Kashy <kashy at jlab.org>,
>> Volker Burkert <burkert at jlab.org>
>>
>>
>>
>> To All,
>>
>> Power outage to confirm connection of Andy Sandorfi's equipment to
>> Emergency Power Circuits. Will kill all utility power, clean power and
>> utility power in Hall B. Only emergency power will remain on.
>>
>> This power outage will be done on Friday at 8:00 AM unless you get with
>> me before that and arrange a different day or time.
>>
>> Thanks, Paul
>>
>>
>> _______________________________________________
>> Hallb-engineering mailing list
>> Hallb-engineering at jlab.org
>> https://mailman.jlab.org/mailman/listinfo/hallb-engineering
>
>
>
>
> _______________________________________________
> Hallb-engineering mailing list
> Hallb-engineering at jlab.org
> https://mailman.jlab.org/mailman/listinfo/hallb-engineering
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/hallb-engineering/attachments/20111025/ef360b7a/attachment-0002.html>
More information about the Hallb-engineering
mailing list