[Hallb-engineering] Support stand in Hall

Douglas Tilles tilles at jlab.org
Thu Nov 6 11:17:24 EST 2014


The new 12 GeV Solenoid stand is in the Hall. The final welding inspection is forth coming.

The 12 GeV Torus spit support tubes will be here right after lunch. 
-------------- next part --------------
A non-text attachment was scrubbed...
Name: 100_2182.JPG
Type: image/jpeg
Size: 1237374 bytes
Desc: not available
URL: <https://mailman.jlab.org/pipermail/hallb-engineering/attachments/20141106/5c8303c1/attachment-0002.jpe>


More information about the Hallb-engineering mailing list