Hello Elton,

Just a few comments regarding SiPM timing measurements:

1. Fernando found a problem with the particular preamp for the
3x3 sensor which we had used for the measurements (a resistor
burned down). Therefore, I would be 'skeptical' about current
3x3 SiPM results. We have just received two fixed preamps from
Fernando and are going to repeat measurements.

2. For the array studies we used not the latest preamp
version. The measurements will be updated as well.

Cheers,
       Sascha



On Mon, 25 Apr 2011, Elton Smith wrote:

> Dear Working Group,
>
> We will have our working group meeting tomorrow. We will need to decide
> on talks for the collaboration meeting, so think about which issues to
> highlight. Also, Vitaly Baturin (Hall B) has been working with Sasha on
> some SiPM timing and rate measurements, which might be of general
> interest. Due to his schedule, I have given him some time at the end of
> the meeting.
>
> Cheers, Elton.
>
> = Tentative Agenda =
>
> # Announcements
> # Review of Action Items
> # Monitoring
> # FCAL
> ## Construction Status: mechanical, bases
> # BCAL
> ## Construction Status: builds, fibre QA
> # Collaboration Meeting Presentations
> # Simulations
> #* [[Media:20110412_bcal_segmentation.pdf|BCAL Segmentation]] (David)
> # SiPM First Article (Yi)
> # [http://www.jlab.org/~baturin/ASIPM-PMT-COMPARISON-APR2011.pdf Timing
> and rate measurements of SiPMs] (Baturin)
>
> -- 
> Elton Smith
> Jefferson Lab MS 12H5
> 12000 Jefferson Ave
> Suite #16
> Newport News, VA 23606
> (757) 269-7625
> (757) 269-6331 fax
>
> _______________________________________________
> Halld-cal mailing list
> Halld-cal at jlab.org
> https://mailman.jlab.org/mailman/listinfo/halld-cal
>


More information about the Halld-cal mailing list