[Halld-cal] FCAL LV Supply was Beam Test

Matthew Shepherd mashephe at indiana.edu
Mon Aug 15 13:51:50 EDT 2011


On Aug 15, 2011, at 1:45 PM, Fernando J. Barbosa wrote:

> Matt, Elton - Hovanes reminded me about the power supplies for the FCAL. The contract, I think, is for IU to supply a complete turn-key detector sub-system which includes the CW bases power supplies. Do you have an updated diagram showing the distribution chassis?

Not at the present moment.  Is there a preferred low voltage power supply vendor that would improve integration into the overall control system?  

-Matt


More information about the Halld-cal mailing list