[Halld-cal] FCAL LV Supply was Beam Test

Fernando J. Barbosa barbosa at jlab.org
Mon Aug 15 14:04:39 EDT 2011


Hi Matt,

GlueX-doc-1035 has an old default configuration using the Wiener MPOD 
system. However, that is just a placeholder for the FCAL - GlueX-doc-747 
has no data for the FCAL supplies. The FCAL suplies (24V) do not have to 
have tight specs, I believe, on noise or regulation and they could be 
some off-the shelf units. I recall these were to be integrated into the 
FCAL distribution boxes.

Best regards,
Fernando




Matthew Shepherd wrote:
> On Aug 15, 2011, at 1:45 PM, Fernando J. Barbosa wrote:
>
>   
>> Matt, Elton - Hovanes reminded me about the power supplies for the FCAL. The contract, I think, is for IU to supply a complete turn-key detector sub-system which includes the CW bases power supplies. Do you have an updated diagram showing the distribution chassis?
>>     
>
> Not at the present moment.  Is there a preferred low voltage power supply vendor that would improve integration into the overall control system?  
>
> -Matt
>   
-------------- next part --------------
A non-text attachment was scrubbed...
Name: barbosa.vcf
Type: text/x-vcard
Size: 188 bytes
Desc: not available
Url : https://mailman.jlab.org/pipermail/halld-cal/attachments/20110815/f065af0d/attachment.vcf 


More information about the Halld-cal mailing list