Another major milestone was reached today: all the racks in the hall
have passed inspection and are now powered (minus U1-13 which is for
accelerator controls and it will be on "dirty" power).
The only remaining power implementation left pertains to the tagger
hall: these racks will be located based on the acceptable radiation levels.
Thanks to Mark Bear for his efforts and for such a great job!