Hi,

That is good news Alex.

I plan to re-connect the Global Crate SSP patch cables to match the 
latest port assignment map.
They are presently organized from an older port map.
Should not take long and will be completed by this afternoon.  If this 
conflicts with any CTP-->SSP testing please advise.

-Chris
~~~~~~~~~~~~
On 4/9/2014 8:18 PM, Alexander Somov wrote:
> Hi,
>
> After fixing some issues with the coda component
> priorities, the TI optical link 5 is working again.
>
> I've connected master TI links for both bcal N4 and S4
> setups back to the port 5  (will reconnect fcal tomorrow).
>
> Bcal fadc board in slot 15 in the crate rocbcal1 has problems
> with loading firmware; I took this board out. We'll
> check it tomorrow. You can read out all fadc boards from all
> N4 and B4 bcal crates now (no boards are missing).
>
> Cheers,
>          Alex
>
>
>
>
>
> _______________________________________________
> Halld-level1 mailing list
> Halld-level1 at jlab.org
> https://mailman.jlab.org/mailman/listinfo/halld-level1





More information about the Halld-level1 mailing list