GlueX TOF Meeting, November 12, 2010
Minutes
* FSU: Sasha Ostrovidov
* JLab: Eugene Chudakov, Paul Eugenio, Mark Ito (chair), Simon
Taylor, Beni Zihlmann
Announcements
Mark reminded us of the plan to break up the PID meeting into three
separate meetings: TOF, start counter, and target. See [21]his email
for details.
Prototype Status
* Paul is working on setting up the new lab space for TOF
construction. He found some extra money to purchase
infrastructure-like items, including a lathe and a buffer wheel for
polishing.
* Sasha has been moving to a set-up to use the "Giles" method using
the new trigger processor.
* There was a problem with the F1 TDC where the TDC was reporting
that the "resolution is not locked". This was fixed by configuring
the TDC to not honor trigger signals on the front panel during
initialization. In the future triggers can be held off upstream of
the TDC.
* Paul has requested a full VME crate from the Fast Electronics
group. Crates should be arriving at JLab in December.
* Eugene would like to get a phototube from FSU so that it can be
looked at in one of the set-ups at JLab.
Mechanical Design
There is a designer that FSU Physics pays for that is now available for
work on the TOF. Paul has received mechanical drawings from IU on the
FCAL geomentry. Paul would like to arrange a meeting soon with
engineering folks at JLab, FSU and IU to get started on the TOF.
Calibration System
We briefly discussed options for a calibration/pulser system for the
TOF. There is not a definite plan right now. There have been
[25]discussions in the past about the need for a laser system like that
used for CLAS in Hall B. We might be able to piggy-back off the Athens
system to be used for the calorimeters.
Trip to Columbia (U. South Carolina)
We discussed again the idea of a visit to USC to see Ralf Gothe's
set-up. Paul agreed that it was a good idea and that he could arrange a
visit, with Sasha, privately with Ralf.
MOU status
The construction MOU between FSU and JLab has been signed by all
parties at FSU and is in the process of collecting signatures at JLab.
Retrieved from
"http://www.jlab.org/Hall-D/software/wiki/index.php/GlueX_TOF_Meeting%2C_November_12%2C_2010"
References
21.
https://mailman.jlab.org/pipermail/halld-pid/2010-November/000066.html
25.
http://www.jlab.org/Hall-D/software/wiki/index.php/GlueX_PID_Meeting%2C_July_9%2C_2010#Need_for_a_laser_calibration_system_for_the_time-of-flight
More information about the Halld-pid
mailing list