Hi all,
I would like to clarify here one point about shipping of equipment away
from the lab.
If there is a contract with a contract number in place between jlab and
an institution
then there is no problem to send whatever is needed for the
construction/testing of
the detector to that institution to fulfil the contract.
If however there exists only a MOU between the lab and an institution
and the lab wants
to send some equipment to that institution then DOE approval is required.
cheers,
Beni
> Mark, Werner,
>
> We have all the cables for installation, which is scheduled to occur
> in late June to early July. Note, however, that the readout w/ SiPMs
> is scheduled to be available by the end of July.
>
> We need to minimize any outside requests for equipment to be shipped
> from JLab due to installation schedules. I also heard that shipping of
> any equipment out of JLab now needs to be approved by DOE. Please
> check on this as soon as possible and develop a plan/schedule,
> considering installation in the hall.
>
> Best regards,
> Fernando
>
>
> On 1/29/2013 10:30 AM, Mark M. Ito wrote:
>> Find the minutes at
>> https://halldweb1.jlab.org/wiki/index.php/GlueX_Start_Counter_Meeting,_January_24,_2013#MinutesGlueX
>>
>> and below.
>>
>> ___
>>
>> Start Counter Meeting, January 24, 2013
>> Minutes
>>
>> Present:
>> * FIU: Werner Boeglin, Puneet Khetarpal, Eric Pooser
>> * JLab: Chuck Hutton, Mark Ito (chair)
>>
>> Contract
>>
>> The proposal from FIU is past due. On the other hand, Mark has
>> exchanged email with Jarrod Fitzpatrick, and this situation
>> seems less
>> than dire. Werner thinks that he can come up with a draft
>> Procedures
>> and QA plan by Monday. Mark agreed to review the plan.
>>
>> Counter Construction
>>
>> Eric is in contact with Chuck Hurlbut at Eljen and Robert McNeal
>> (at
>> McNeal) and is getting quotes on their respective construction
>> steps.
>> The cost from McNeal should be about the same as for the previous
>> prototypes.
>>
>> Werner asked about cables for testing the counters. Mark told us
>> that
>> his understanding is that JLab will supply the cables. Mark will
>> confirm that with Fernando. We decided that we would make a
>> tentative
>> plan to try to test all thirty counters at once at FIU. That
>> will drive
>> plans for lending electronics and for manufacturing cables in
>> advance
>> of installation in the Hall.
>>
>> Eric reported that Eljen is suggesting that we use EJ-200 rather
>> than
>> the EJ-212 we had planned for originally. We will order five
>> counters
>> initially, with height and width of 3 mm × 30 mm before machining.
>> Including the cost of practice runs, it should come out to about
>> $200
>> per counter. Eljen says that once the order has been placed, the
>> counters can be manufactured in a matter of days.
>>
>> Chuck Hutton will ask around and see how folks at the Lab have made
>> sure that vendors adhere to the required shipping standards.
>>
>> Assembly Drawings
>>
>> We looked at a set of drawings Chuck has done with the final
>> dimensions
>> of the start counter support structure.
>> * [17]Foam Cone Assembly
>> * [18]Inner Foam Cone
>> * [19]Foam Cone Ring
>>
>> Retrieved from
>> "https://halldweb1.jlab.org/wiki/index.php/GlueX_Start_Counter_Meeting,_January_24,_2013"
>>
>>
>> References
>>
>> 17. https://halldweb1.jlab.org/talks/2013-1Q/1001.pdf
>> 18. https://halldweb1.jlab.org/talks/2013-1Q/2001.pdf
>> 19. https://halldweb1.jlab.org/talks/2013-1Q/2002.pdf
>>
>> _______________________________________________
>> Halld-pid mailing list
>> Halld-pid at jlab.org
>> https://mailman.jlab.org/mailman/listinfo/halld-pid
>
>
>
> _______________________________________________
> Halld-pid mailing list
> Halld-pid at jlab.org
> https://mailman.jlab.org/mailman/listinfo/halld-pid
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/halld-pid/attachments/20130131/9e53df6c/attachment-0002.html>
More information about the Halld-pid
mailing list