To: Axel Schmidt <schmidta at jlab.org>, Douglas Higinbotham <doug at jlab.org>, Edward R Kinney <edward.kinney at colorado.edu>, Florian Hauenstein <hauenst at jlab.org>, hamlet at jlab.org, Holly Szumila-Vance <hszumila at jlab.org>, Larry Weinstein <weinstei at jlab.org>, Or Hen <hen at mit.edu>, Peter Bosted <bosted at jlab.org>, William Henry <wmhenry at jlab.org>, Dien Nguyen <dien at jlab.org>
Subject: Update on the beam start
Hi,
The Schedule Accelerator Maintenance (SAM) met this afternoon and I have got unofficial update that
the accelerator tentative SAM schedule has been updated to show Physics beam on the 28th of February
BUT they are looking at ways to save time. Thus, the estimate of the soonest beam could be ready for
physics is the 14th of February. So I have told the staff, engineers and technicians to prepare for Feb 14th start.
At this point we still do not have an official run schedule, but for now we assume that the draft schedule
will just be shifted. Doug is meeting with David Dean to discuss the schedule on Friday. As mentioned before , there is
pressure to start the Hall A SBS deinstallation/ MOLLER installation as early as possible which could impact Hall C start up.
I think that it makes the most sense to keep the schedule as it was.
So the shift schedule can be updated to reflect the possible Feb 14th start. Hopefully we will get another update
relatively soon.
Cheers,
Mark
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/lad_hallc/attachments/20250109/39fa0854/attachment.html>
More information about the Lad_hallc
mailing list