I have attached a draft plan for the run to the 1G dump.  Since we can only run 14 MeV or so to that dump we will have to turn on the cavities one at a time after starting with the first two on (cavities 7 and 8).  You then turn off 7 and turn on  6 and phase each one using the 1G dump as a spectrometer.  I don’t think we will get to the centering and phasing in one shift but I included it there for completeness. This probably has several errors in it but look it over to see what is wrong or missing.
I will need some quad settings for the 1F line for a 13 MeV beam.

Stephen Benson
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/lerftest/attachments/20190329/175958a9/attachment-0001.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: LERF 1G run description.docx
Type: application/vnd.openxmlformats-officedocument.wordprocessingml.document
Size: 17979 bytes
Desc: LERF 1G run description.docx
URL: <https://mailman.jlab.org/pipermail/lerftest/attachments/20190329/175958a9/attachment-0001.docx>


More information about the Lerftest mailing list