Peppo production running ended at noon today and a series of systematic 
studies have been taking place since noon.    The BPM pedestal data and 
final PITA scans were completed first off.   This was followed by an 
access to install the "E" counter, a large (but perhaps not large 
enough) plastic scintillator to measure the energy of the positron 
beam.   It was discovered that the E counter pulse height increased with 
lower  beam energy, and then by beam steering.     The present thought 
is that the positron energy is 100% captured by the scintillator, 
perhaps due to the average beam location not quite at the center of the 
detector.

Never the less,  the Fiber Array studies will take place on Owl shift 
and if a larger crystal/scintillator can be found during Monday Day 
shift the energy measurements will resume.   Below is the status of the 
"Systematic Studies" plan as of 20:19 this evening.

>
>     1 2012-06-24 Sun Day/Swing systematic studies
>
>
> What 	Duration 	Who 	Run # 	Elog 	Why
>
> 	(h) 	
> 	
> 	
> 	
> BPM Pedestal Current 120nA 	0.25 	Riad 	6691 	1793845 
> <http://opsweb.acc.jlab.org/CSUEApps/elog/entry/1793845> 	Do these 
> runs Saturday Swing
> BPM Pedestal Current 200nA 	0.25 	
> 	6675 	1793769 <http://opsweb.acc.jlab.org/CSUEApps/elog/entry/1793769> 	
> BPM Pedestal Current 330nA 	0.25 	
> 	6674 	1793765 <http://opsweb.acc.jlab.org/CSUEApps/elog/entry/1793765> 	
> 400na 	
> 	
> 	6672 	1793755 <http://opsweb.acc.jlab.org/CSUEApps/elog/entry/1793755> 	
> BPM Pedestal Current 450nA 	0.25 	
> 	6690 	1793842 <http://opsweb.acc.jlab.org/CSUEApps/elog/entry/1793842> 	
> BPM Pedestal Current 690nA 	0.25 	
> 	6673 	1793765 <http://opsweb.acc.jlab.org/CSUEApps/elog/entry/1793765> 	
> PITA scan 	
> 	
> 	6692,6693,6694 	
> 	
> PITA scan 	
> 	
> 	6695,6696 	
> 	
>
> 	Total 	1.5 	
> 	
> 	
> See this peppo entry for more details 
> <http://opweb.acc.jlab.org/CSUEApps/elog/entry/1793735> 	
> 	
> 	
> 	
> 	
>
> 	
> 	
> 	
> 	
> 	
> Change spectrometer to 6.2MeV/c, 1mm W 	0.17 	
> 	6698 	1793860 
> <http://opsweb.acc.jlab.org/CSUEApps/elog/entry/1793860> 	Measure TS1 
> rate: measured 199.51 KHz
> Access to Inj (rewrite to reflect grames plan) 	1 	Grames 	
> 	1793866 <http://opsweb.acc.jlab.org/CSUEApps/elog/entry/1793866> 
> Retract Polarimeter, install E1 counter
> Reconfigure Trigger 	1 	Erica 	
> 	
> 	TS1.E1 coincidence, real time, 30Hz, sample mode
> E profile at 6.2MeV/c, TS1 30mV 	0.5 	
> 	6715 	
> 	E1 EPICS name is: Inj_Scaler ?_Ch ?
> E profile at 6.2MeV/c, TS1 @ 10mV 	0.17 	
> 	6716 	
> 	
> E profile at 6.2MeV/c, E1 only trigger 	0.17 	
> 	6717,6718 	
> 	
> Change spectrometer to 5.2MeV/c 	0.1 	
> 	
> 	
> 	
> E profile at 5.5MeV/c, TS1 30mV 	0.17 	
> 	
> 	
> 	
> E profile at 5.5MeV/c, TS1 @ 10mV 	0.17 	
> 	6719 	
> 	
> E profile at 5.5MeV/c, E1 only trigger 	0.17 	
> 	6720,6721 	
> 	
> Change spectrometer to 4.2MeV/c 	0.1 	
> 	
> 	
> 	
> E profile at 4.2MeV/c, TS1 30mV 	0.17 	
> 	6722 	
> 	
> E profile at 4.2MeV/c, TS1 @ 10mV 	0.17 	
> 	6723 	
> 	
> E profile at 4.2MeV/c, E1 only trigger 	0.17 	
> 	6724 	
> 	
> Change spectrometer to 3.2MeV/c 	0.1 	
> 	
> 	
> 	
> E profile at 3.2MeV/c, TS1 30mV 	0.17 	
> 	6725 	
> 	
> E profile at 3.2MeV/c, TS1 @ 10mV 	0.17 	
> 	6726 	
> 	
> E profile at 3.2MeV/c, E1 only trigger 	0.17 	
> 	6727 	
> 	
> Change to 0.1mm target 	0.01 	
> 	
> 	
> 	
> E profile at 3.2MeV/c, TS1 30mV 	0.17 	
> 	6728 	
> 	
> E profile at 3.2MeV/c, TS1 @ 10mV 	0.17 	
> 	6729 	
> 	
> E profile at 3.2MeV/c, E1 only trigger 	0.17 	
> 	6730, 6731 	
> 	scans complete by 17:16
>
> 	Total 	5.36 	
> 	
> 	
> Change spectrometer to 6.2MeV/c, 1mm W 	0.1 	
> 	
> 	
> 	Measure TS1 rate
> Configure *BFM* 31MHz 	0.5 	
> 	
> 	
> 	
> E profile at 6.2MeV/c, TS1 30mV 	0.17 	
> 	6733 	1793962 
> <http://opsweb.acc.jlab.org/CSUEApps/elog/entry/1793962> 	Pandemonium 
> and confusion sets in trying to
> Change spectrometer to 5.2MeV/c 	0.1 	
> 	
> 	1793965 <http://opsweb.acc.jlab.org/CSUEApps/elog/entry/1793965> 
> interpret the signals. Width of timing signal
> E profile at 5.2MeV/c, TS1 30mV 	0.17 	
> 	
> 	
> 	of order 1.2-1.3 nsec. This is physically
> Change spectrometer to 4.2MeV/c 	0.1 	
> 	
> 	
> 	about 15inches, quite a large fraction of the
> E profile at 4.2MeV/c, TS1 30mV 	0.17 	
> 	
> 	
> 	beam transport.
> Change spectrometer to 3.2MeV/c 	0.1 	
> 	
> 	
> 	
> E profile at 3.2MeV/c, TS1 30mV 	0.17 	
> 	
> 	
> 	
> Change to 0.1mm target 	0.01 	
> 	
> 	
> 	
> E profile at 3.2MeV/c, TS1 30mV 	0.17 	
> 	
> 	
> 	
>
> 	
> 	1.5 	
> 	
> 	
> Switch to electron mode, measure profile 	
> 	
> 	
> 	
> 	6.2MeV/c e- saturated the E counter, switched to
> at two or three energies 	2 	
> 	
> 	
> 	3.2MeV/c for cross calibration purposes, although
>
> 	
> 	
> 	
> 	
> 	due to the difference in signal between e- and e+
>
> 	
> 	
> 	
> 	
> 	it is hard to say what we are calibrating.
>
> 	Total 	2 	
> 	
> 	*We are Here at 20:30*
> Access to Inj 	1 	Joe 	
> 	
> 	Remove E counter, install NaI and W
> NaI coincidence Tests 	3 	
> 	
> 	
> 	Deferred to Monday Swing?
>
> 	Total 	4 	
> 	
> 	this is a like
> see: Fiber Array Plan 
> <https://positron.jlab.org/wiki/images/c/c9/FinalHours_2012JUNE24_FiberArray.pdf> 
> 	
> 	
> 	
> 	
> 	
>
> 	
> 	
> 	
> 	
> 	
> Access to Inj 	2 	Gueye 	
> 	
> 	install Fiber Array
> Change spectrometer to 6.2MeV/c, T=1mm 	0.17 	
> 	
> 	
> 	
> Recommission Fiber Array 	1 	
> 	
> 	
> 	
> Position Scans (? = 1cm, X & Y) 	0.68 	
> 	
> 	
> 	
> e+ profile at 6.2 MeV/c 	0.17 	
> 	
> 	
> 	
> Change spectrometer to 5.2MeV/c 	0.17 	
> 	
> 	
> 	
> e+ profile at 5.2 MeV/c 	0.17 	
> 	
> 	
> 	
> Change spectrometer to 4.2MeV/c 	0.17 	
> 	
> 	
> 	
> e+ profile at 4.2 MeV/c 	0.17 	
> 	
> 	
> 	
> Change spectrometer to 3.2MeV/c 	0.17 	
> 	
> 	
> 	
> e+ profile at 3.2 MeV/c 	0.17 	
> 	
> 	
> 	
> Change spectrometer to 3.2MeV/c w/ 0.1mm W 	0.17 	
> 	
> 	
> 	
> e+ profile at 3.2 MeV/c 	0.17 	
> 	
> 	
> 	
> Scan beam across T2, record 5minute runs 	0.5 	
> 	
> 	
> 	
> Flip analyzing magnet polarity, study position/profile 	0.5 	
> 	
> 	
> 	
> Vary S2 	0.62 	
> 	
> 	
> 	
>
> 	Total 	7.0 	
> 	
> 	
>
> 	Grand Total 	20 	
> 	
> 	4h more than 16.....
>

-- 
Arne Freyberger
Director Operations Department
Jefferson Lab           Phone: (757) 269-6268
12000 Jefferson Avenue  Pager: (757) 584-6268
Newport News, VA 23606  Email:  freyberg at jlab.org

-------------- next part --------------
An HTML attachment was scrubbed...
URL: https://mailman.jlab.org/pipermail/peppo/attachments/20120624/3ddf3da2/attachment-0001.html 


More information about the PEPPo mailing list