[PEPPo] thank you

Joe Grames grames at jlab.org
Thu May 17 16:40:59 EDT 2012


Dear All,

The new solenoid is operating successfully.

It was mapped today and will be ready for installation tomorrow.  At the 
max momentum our spectrometer will allow ~8MeV/c the smallest achievable 
focal length will be ~51cm.  Our design goal was 50cm.  Roughly speaking 
~all those e+ w/ momentum <6.3MeV and reaching inside the vacuum pipe at 
the solenoid should be collected through the exit vacuum window.  
Promising news for success.

Congratulations to all those that helped make this mon-ster-noid possible!

-Joe


 
-------------- next part --------------
An HTML attachment was scrubbed...
URL: https://mailman.jlab.org/pipermail/peppo/attachments/20120517/526c1b12/attachment-0001.html 
-------------- next part --------------
A non-text attachment was scrubbed...
Name: MPT5D04.JPG
Type: image/jpeg
Size: 147397 bytes
Desc: not available
Url : https://mailman.jlab.org/pipermail/peppo/attachments/20120517/526c1b12/attachment-0001.jpe 


More information about the PEPPo mailing list