[PEPPo] Daily RC Report 5/29
Joe Grames
grames at jlab.org
Tue May 29 20:16:08 EDT 2012
*Daily RC Report 5/29:*
Efforts over the last shifts have focused on the collection process and
detector setup to measure and distinguish both e- and e+. Last SWING
began with Ebeam~6MeV/c and extended e- collection to ~first systematic
effort to collect e+ and provide a signal for detector setup. A first
pass collect of e+ at 4MeV/c was performed and the spectra is perhaps
first indication of the positron signal exiting the vacuum window.
However at the end of SWING the E1 detector was removed to facilitate
setup of the Compton detector (PMT5) in coincidence w/ TS1. Because the
efficiency of Compton rate to positron rate is ~1E-3 the initial setup
in e+ mode was later switched to degraded e- in order to help determine
the TS1/PMT5 coincidence. On last DAY we performed fiber array detector
checkout with beam; there was some signal in vertical array, but
detector is not ready to be used yet. Afterward, we increased the beam
energy to ~8MeV/c production and characterized collection of e- and e+
using T1=0.1mm W and beam currents up to 5 microAmps. The target
performed fine and vacuum level remained below ~5E-8 Torr. At the
beginning of SWING tests to repeat characterization w/ T1=1.0mm W were
in process. The goal is to learn that we can systematically recover
yields of e- or e+ using similar conditions of target, beam current and
magnet settings, such that detector commissioning and calibration may
proceed.
*Noteworthy items:*
1. I will prepare a brief RC report for the Wed 8am meeting, also when
Eric takes over as RC
2. Spectrometer PS occasionally trips off on HV fault during polarity
reversal; must go to ISB to reset PS
3. The annihilation detector (right) is again working and installed.
*Next 24 hours:*
Tuesday, 5/29 - SWING SL=Freyberger
Using P=8MeV/c repeat collection study of degraded e- and e+ from
T1=1mm W
Setup e- or e+ conditions for OWL optimization of coincidence
between TS1 & PMT5
Wednesday, 5/30 - OWL SL=Suleiman
Optimization of conincidence between TS1 & PMT5 w/ e- and e+
Wednesday, 5/30 - DAY, SL=Grames
Further optimize e- and e+ collection vs. collimator settings
Use steering magnet and PMT's to deflect e- and e+
-------------- next part --------------
An HTML attachment was scrubbed...
URL: https://mailman.jlab.org/pipermail/peppo/attachments/20120529/91d0784c/attachment.html
More information about the PEPPo
mailing list