[Sns_ppu_group] Fw: PPU weekly update

Ed Daly edaly at jlab.org
Mon Aug 23 08:33:41 EDT 2021


Hi All,
See the weekly report below from John Galambos.  Hopefully this gives a bit of perspective on the other areas of the PPU project.
We can answer questions at our weekly meeting.
Cheers,
Ed

________________________________
From: Galambos, John D. <galambosjd at ornl.gov>
Sent: Friday, August 20, 2021 3:44 PM
To: PPU Staff <ppustaff at ornl.gov>
Cc: Andersen, Ken <andersenkh at ornl.gov>; Ed Daly <edaly at jlab.org>; Cain, Wendy <cainwa at ornl.gov>
Subject: [EXTERNAL] PPU weekly update


This week the PPU project updated presentations for the upcoming IPR project review in Sept., including preparation of additional project controls material. At JLab, cryomodule 1 has moved into the space frame/thermal shield assembly stage and string two is being pumped down following a gate valve assembly replacement. In the RF area the new klystron CD-3b long lead procurement fabrication is moving well with 11 of the 12 items complete. Also reworked RF loads are received from a vendor. In the ring area the new foil changer is being procured. In the target area bids arrived for the moderator/convertor assembly, and test target 1 is scheduled to ship to SNS this week, on track for installation this fall. Klystron gallery work is progressing well, with completion of the RF waveguide installation on the tunnel wall side, and cable pulls in the target building basement are ongoing for the upgraded off gas carbon absorber systems.



Lots of balls in the air now – thanks much and have a great weekend -   jg





John Galambos

Proton Power Upgrade Project  Director

Mobile: 865-228-1531 office: 865-576-5482






-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/sns_ppu_group/attachments/20210823/c32588b9/attachment.html>


More information about the Sns_ppu_group mailing list