[Dsg-rich] Installation of support panels in RICH detector
Ed Folts
folts at jlab.org
Mon Mar 13 07:46:55 EDT 2017
Hi Marc
It would probably be wise to fill out a B list just to cover the bases.
thanks
Ed
On 3/10/2017 3:36 PM, Marc McMullen wrote:
> Hi Ed,
>
> The tasks covered in TOSP are essentially complete, we will perform
> two more lifts covered withing the scope of that TOSP.
>
> Next week INFN and the DSG will perform the installation of the
> support panels for the electronics (Electronics to be installed at a
> later date, under a new TOSP). These tasks are not covered in the
> current TOSP, it is an intermediate task between the ones covered in
> the current and the ones which will be covered in the installation of
> electronics, mirrors, and PMTs. The task involves using standard
> tools to do the installation. We will use the enclosed platform stairs
> to work on anything greater than normal standing height. There will be
> no use of the gantry or winch to perform these tasks. So I am handling
> this with an informal THA as per the work planning guidance, I
> estimate the work to take much less than 2 weeks. We will still do the
> standard pre-job briefings prior to the shift.
>
> Thanks,
>
>
>