Hi Tyler,
I'm working with Dario, Sandro and the others from italian side to set
up a plan for the next RICH assembly efforts. The things to be done are
many and interconnected, so it's not easy to put everything together.
I hope to have soon a first draft we can discuss with DSG and other JLab
people.
Best regards,
Marco
Il 2017-05-18 14:11 Tyler Lemon ha scritto:
> Hello Marco Mirazita and Marco Contalbrigo,
>
> Now that the spherical mirrors have shipped, we have a few questions
> regarding upcoming tasks.
>
> MIRRORS:
>
> 1.) When should we expect the mirrors to be shipped back to JLab after
> their final coating? It was estimated that it will take one month to
> deposit the final coating on the spherical mirrors, so should we
> expect the mirrors to arrive at JLab at near the end of June 2017?
>
> 2.) Will JLab Shipping & Receiving need to arrange for the mirrors'
> shipment back to JLab? We know that the process of arranging the
> shipment takes about one week. If JLab needs to arrange the shipment
> from ECI, it would be helpful to get the required information as soon
> as possible. Information we would need is: quantity of handling units
> to be shipped, dimensions and weight of handling units to be shipped,
> cost estimate of mirrors with final reflecting coating, and address
> that mirrors will ship from.
>
> 3.) Do we plan to repeat the optical measurements (d0 measurements,
> Shack-Hartmann images) with each individual mirror? If so, we would
> need both the CCD and light source for the test stand. When could we
> expect the CCD and light source to return to JLab?
>
> AEROGEL:
>
> 4.) What is the status of Aerogel shipments?
>
> 5.) When should we expect the next shipment of Aerogel at JLab?
>
> ELECTRONICS:
>
> 6.) What is the status of electronic assembly?
>
> 7.) When should we expect to start assembling the electronic panel?
>
> 8.) Have there been any finalized plans on what will be needed for
> cosmic tests (cooling, nitrogen, interlocks, etc.) and when we would
> want to take cosmic data?
>
> GAS SYSTEM:
>
> 9.) When will the cooling system be required? The DA approval of the
> entire RICH Gas System is complete. We are waiting for the components
> to connect power to the air compressors in the EEL. We can push for
> the compressor's power to be connected sooner if we know a date when
> it would be needed.
>
> INTERLOCK SYSTEM:
>
> 10.) When is the Hardware Interlock System needed? DSG plans on
> completing the initial development of the system by the end of June
> 2017.
>
> 11.) Is there a plan for where the internal temperature and humidity
> sensors will be placed in the detector?
>
> ASSEMBLY:
>
> 12.) For DSG planning purposes, when are INFN collaborators planning
> to return to JLab for assembly tasks?
>
> Please let us know so we can begin planning for all of the above
> tasks.
>
> Best regards,
>
> Tyler
>
>
> _______________________________________________
> Dsg-rich mailing list
> Dsg-rich at jlab.org
> https://mailman.jlab.org/mailman/listinfo/dsg-rich
More information about the Dsg-rich
mailing list