[Dsg-rich] would future RICH assemblies require an additional gas tank and panel?

Marco Mirazita Marco.Mirazita at lnf.infn.it
Fri May 19 12:02:57 EDT 2017


Hi Tyler,
RICH #2 will come in few years from now, so we have plenty of time to 
discuss how to operate it in the EEL-124. But for sure we won't need 
such a huge cooling system.
On the other hand, we might need to flux nitrogen inside the RICH #1 
during the time between when the gas system is moved in Hall B and when 
the RICH installation in CLAS12 is completed.
This is something we should discuss and is connected we the assembly 
plan we are developing.
Best regards,
Marco


Il 2017-05-18 14:25 Tyler Lemon ha scritto:
> Hello Marco Mirazita and Marco Contalbrigo,
> 
> The current set-up for any tests in the EEL requiring cooling and a
> nitrogen purge includes using the gas tank and panel designed by
> George Jacobs. When the first RICH sector (RICH #1) is installed in
> Hall B, the gas tank and panel will need to go to Hall B as well to
> provide cooling air and the nitrogen purge. When RICH #1 is in Hall B
> and assembly begins on any future RICH sector, we will not have this
> gas tank or gas panel in the EEL building.
> 
> While the need for the second gas tank and panel would not be until
> after RICH #1 is installed in Hall B, should we plan on procuring and
> assembling an additional RICH gas tank and panel for use in the EEL
> building? Looking back at our procurement lists, the cost of the
> additional tank and panel is estimated at ~$20,000.
> 
> Please let us know.
> 
> Regards,
> 
> Tyler
> 