[Dsg-rich] EEL 124/125 power and Room temperature
Walt Akers
akers at jlab.org
Mon Nov 20 12:55:38 EST 2017
Will do. I'll add that to my supported systems list that I submit
to Facilities before the shutdown.
Walt
Marc McMullen wrote:
> Hi Walt,
>
> The DSG manager would like to ensure that power will remain on during
> the holiday shutdown in December for rooms 124 and 125 in the EEL. The
> RICH detector may be using the compressor during that period to supply
> air. Additionally, the system used to monitor detector conditions will
> need to be powered.
>
> Thanks,
>
More information about the Dsg-rich
mailing list