[G14_run] Plan for the remainder of the running time
A.M. Sandorfi
sandorfi at jlab.org
Fri Apr 13 15:16:41 EDT 2012
Folks,
Attached is a draft of the revised run plan that we discussed this morning.
The spins are oriented along the beam axis (+H,+D). The present circular
running continues through next Thursday morning (4/19), accumulating 9 days.
Probably most of Thursday is used up by Machine studies and the energy
change. The time after that is split into 3 linear energy bins: 1.6-1.8,
1.8-2.0 and 2.02.2. On May 9th we will flip the H spin and run the last 8
days in the (-H, +D) spin orientation.
>From the g1c data for K+L (which won¹t be the same as K0L but it¹s all we
have to go on at the moment), the total cross section falls by almost a
factor of 2 across the 1.6 to 2.2 GeV range, but it¹s mostly the large angle
cross section that is falling forward angles stay about the same.
With this in mind, a proposed compromise is as follows:
1.6 1.8 GeV: 5 days with (+H,+D) and 2 days of (-H,+D);
1.8 2.0 GeV: 7 days with (+H,+D) and 3 days of (-H,+D);
2.0 2.2 GeV: 2 days from last week + another 7 with (+H,+D) and 3 days of
(-H,+D).
Comments are welcome,...
Andy
-------------- next part --------------
An HTML attachment was scrubbed...
URL: https://mailman.jlab.org/pipermail/g14_run/attachments/20120413/7d9ca904/attachment-0001.html
-------------- next part --------------
A non-text attachment was scrubbed...
Name: 12 Spr12 HDice runplan expand-Apr13'12.fts.pdf
Type: application/octet-stream
Size: 62504 bytes
Desc: not available
Url : https://mailman.jlab.org/pipermail/g14_run/attachments/20120413/7d9ca904/attachment-0001.obj
More information about the G14_run
mailing list