[Halla_min] Minutes of Hall A Group Meeting: February 23, 2021
Stephanie Tysor
stysor at jlab.org
Wed May 19 18:48:55 EDT 2021
Minutes of Hall A Group Meeting: February 23, 2021
1. Thia Keppel
* Hall A – crane currently locked out, working on safety evaluation and alternate options
* Senior Staff Meeting
* Public version of EIC CDR released Monday, should be posted by EICUG soon
* Down select review of EIC crab cavity designs went to charge control board
* The CEBAF injector was baked (for better vacuum, part of parity upgrade)
* VITF booster seems to be working well
* Final draft of work from home policy is in the works (beyond computer)
* In midst of ESR cooldown
* CHL-2K cold box work going well
* CST – changed routers last week to use both 10GB lines from ESNET, getting their attention
* Hall B & C limited in hot work, need to discuss process
* Get your property validation done!
* Foreign government form was NOT supposed to be also for Users per DOE
* Diversity & Inclusion demographic kickoff meetings started – 4 last week, good attendance (53, 33, 20+ x 2)
* Weekly briefs – new one for staff different form for users
2. Robin Wines
* SBS
* Working on details of ECal and CDet supports and cabling
* Reviewed BB GEM test install
* Sent RFI for BB and SBS sieve plates
* Provided information to SBS collaboration for meeting
* Working on details of compass for GEn target field measurements
* Setting up meetings for SIDIS and TDIS
* Submitted GEn target field shield box to machine shop for modification
* Moller
* Working on shielding, beamline, pivot load analysis, pion donut alignment and detector frames
* SoLID
* Working on coil test setup
* Hall
* Supporting install activities
* Reviewed AHU proposal
* P&ID of LCW system complete
3. Jessie Butler
* Continue 2MVA power upgrade work (FML)
* Completed ground water leak repair in Compton area (FML)
* Site visit with Barnhart (crane subcontractor) to discuss supporting Hall A while crane is down (FML)
* Add extension to Big Bite carriage
* Install two INFN GEMs in frame on BB detector package
* Redo hangers for LCW system
* Cut shims that is needed for building and leveling upstream shielded bunker
* Clear interferences underneath pivot and clear floor space for moving RHRS
* SBS collaboration meeting
* Continue working on Counting House renovation
Stephanie Tysor
Hall A/C Administrative Assistant
Physics Division
Jefferson Lab
757-269-6005
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/halla_min/attachments/20210519/f446767d/attachment-0001.html>
More information about the Halla_min
mailing list