Arne - proposed plan...

1400 - 1600 (lead = Grames)
* Lock up injector segment (gun + capture ON)
* Setup INJTWF for transverse polarization @ Mott
* Optimize Hall C laser orbit + BFM to FC1

1600 - 1800 (lead = Poelker)
* Lock up injector/north linac
* Setup crested orbit to 2D, bump up momentum to 5.487MeV/c
* Setup beam to Mott viewer, adjust quads for spot

1800 - 2100 (lead = Suleiman)
* DAQ/BFM/Macro checkout w/ 1um gold target
* Elastic asymmetry scan vs. position (left/right/up/down)
* Determine operational settings (atten/slit/current) for 5 targets

2100 - 0600 (lead = shift leader)
* Production at 5.487MeV/c
	* 1h @ 5.00 (extra time is for stability test)
	* 1h @ 1.00 (extra time is for stability test)
	* 1h @ 0.35
	* 2h @ 0.10
	* 4h @ 0.05

  