- [Dsg-rich] ECI target schedule for INFN RICH Mirrors
Tyler Lemon
- [Dsg-rich] Shipping for two RICH mirrors from ECI in PA to JLab
Tyler Lemon
- [Dsg-rich] stainless steel RICH cooling manifolds
Tyler Lemon
- [Dsg-rich] Purchases
dario.orecchini at lnf.infn.it
- [Dsg-rich] Hermetic feedthrough alternative
Tyler Lemon
- [Dsg-rich] Upper Frontal Panel Tool
dario.orecchini at lnf.infn.it
- [Dsg-rich] ECI packaging for INFN RICH Mirrors - Let's discuss/confirm together?
Barbara Monti
- [Dsg-rich] GandR Parts
Marc McMullen
- [Dsg-rich] Cooling manifold test with 16-foot 1/2" OD line
Tyler Lemon
- [Dsg-rich] throttled/choked flow.
Amrit Yegneswaran
- [Dsg-rich] RICH gas system questions
Tyler Lemon
- [Dsg-rich] RICH compressor drain line
Tyler Lemon
- [Dsg-rich] Schedule RICH stiffening tool load test
Tyler Lemon
- [Dsg-rich] adding additonal tables to and arranging EEL 124 clean room for RICH assembly.
Tyler Lemon
- [Dsg-rich] MVT items in front of RICH compressor in EEL 124
Tyler Lemon
- [Dsg-rich] RICH mirror shipping from CMA to ECI
Tyler Lemon
- [Dsg-rich] Remaining Mirrors
Tyler Lemon
- [Dsg-rich] RICH mirror shipment cost estimate
Tyler Lemon
- [Dsg-rich] ECI delivery & pick-up updates for INFN RICH Mirrors
Barbara Monti
- [Dsg-rich] 80/20 Components
Dario Orecchini
- [Dsg-rich] VB7000 pulley received
Tyler Lemon
- [Dsg-rich] Intial questions for RICH gas system upgrade in FY2018
Tyler Lemon
- [Dsg-rich] RICH installation meeting
Marco Mirazita
- [Dsg-rich] [New Logentry] LN2 Dewar
beng at jlab.org
- [Dsg-rich] [New Comment] LN2 Dewar
tlemon at jlab.org
- [Dsg-rich] Cooling test complete, compressor powered off
Tyler Lemon
- [Dsg-rich] Delivery
Marc McMullen
- [Dsg-rich] Entrance panels Assembly Tools Update
Dario Orecchini
- [Dsg-rich] RICH installation activity
Marco Mirazita
- [Dsg-rich] Week activity
Marco Contalbrigo
- [Dsg-rich] mirror pickup at ECI
Marco Mirazita
- [Dsg-rich] RICH stiffening tool load test
Tyler Lemon
- [Dsg-rich] confirm all RICH mirrors received?
Tyler Lemon
- [Dsg-rich] G&R parts received
Tyler Lemon
- [Dsg-rich] update to RICH hardware interlock system
Tyler Lemon
- [Dsg-rich] 17-m1088, 17-m1087, 17-m1086
Marc McMullen
- [Dsg-rich] feedthrough for the sensors
Marco Mirazita
- [Dsg-rich] ECI status update for RICH mirrors - only 6 received & 2 coated mirrors ready for pick-up between today and tomorrow.
Barbara Monti
- [Dsg-rich] reuse shoe covers for EEL 124 clean room
Tyler Lemon
- [Dsg-rich] Jlab Welding Review
Michael Martin
- [Dsg-rich] ECI status update for RICH mirrors - 2 coated mirrors ready for pick-up
Barbara Monti
- [Dsg-rich] Fwd: Invoice M-2599 from Composite Mirror Applications, Inc.
Marco Mirazita
- [Dsg-rich] RICH planar mirror B2 received at JLab, stored in EEL 125
Tyler Lemon
- [Dsg-rich] RICH stiffening tool load test weights, dynamometer, trolley wheels?
Tyler Lemon
- [Dsg-rich] DC trolley to EEL?
Tyler Lemon
- [Dsg-rich] RICH stiffening tool load test meeting minutes
Tyler Lemon
- [Dsg-rich] Fwd: Confirmation for Your October 11th Order with McMaster-Carr
George Jacobs
- [Dsg-rich] DC trolley and weights for RICH load test to EEL
Tyler Lemon
- [Dsg-rich] Stiffening Tool_June 2017.pdf
Marc McMullen
- [Dsg-rich] G&R part for RICH trolley bracket - one hole in incorrect location
Tyler Lemon
- [Dsg-rich] ECI status update for RICH mirrors - 2 coated mirrors ready for pick-up 10/10
Barbara Monti
- [Dsg-rich] Ventilation Purge presentation
Amanda Hoebel
- [Dsg-rich] Stiffening Tool
dario.orecchini at lnf.infn.it
- [Dsg-rich] Incorrect hole location
Marc McMullen
- [Dsg-rich] RICH planar mirror B2 inspected, stored in EEL 121 small clean room
Tyler Lemon
- [Dsg-rich] length of straps in diagram for RICH stiffening tool load test?
Tyler Lemon
- [Dsg-rich] CLAS12 RICH Installation Meeting
Marco Contalbrigo
- [Dsg-rich] ECI request status update for RICH mirrors - 2 coated mirrors ready for pick-up 10/10 & 4 uncoated mirrors on hold at ECI
Barbara Monti
- [Dsg-rich] Status of RICH mirror shipments
Tyler Lemon
- [Dsg-rich] Interlock sensors
Marco Contalbrigo
- [Dsg-rich] Dry tent
Marc McMullen
- [Dsg-rich] Auxillary Nitrogen supply for RICH
Marc McMullen
- [Dsg-rich] able to turn off RICH hardware interlock cRIO?
Tyler Lemon
- [Dsg-rich] [New Logentry] N2 Panel Flow
beng at jlab.org
- [Dsg-rich] Fwd: Re: Dry tent
Marc McMullen
- [Dsg-rich] Assumptions for the N2 purge test
Pablo Campero
- [Dsg-rich] detailed rich schedule
Tyler Lemon
- [Dsg-rich] RICH parts list
Tyler Lemon
- [Dsg-rich] humidty/temperature sensors on RICH electronic panel to be removed
Tyler Lemon
- [Dsg-rich] Green House
Marc McMullen
- [Dsg-rich] ECI received 4 and shipped 2 RICH mirrors Oct 16th
Barbara Monti
- [Dsg-rich] MVT exhaust fan in EEL 124
Tyler Lemon
- [Dsg-rich] Fwd: CVT installation schedule
Brian Eng
- [Dsg-rich] Spherical Mirrors 3 and 6 at JLab
Tyler Lemon
- [Dsg-rich] Load Test Pre-brief
Mark McMullen
- [Dsg-rich] Mirror 4 and 6 inspected; starting reflectivity test
Tyler Lemon
- [Dsg-rich] Auxillary N2 gas set up for RICH
Marc McMullen
- [Dsg-rich] RICH N2 high pressure cylinders.
Marc McMullen
- [Dsg-rich] Reflectivity measurements of RICH spherical mirror 6
Tyler Lemon
- [Dsg-rich] reference mirror reflectivity measurements after test station's move to cleanroom
Tyler Lemon
- [Dsg-rich] mirror 6 reflectivity measurements
Tyler Lemon
- [Dsg-rich] shipping of RICH mirrors
Tyler Lemon
- [Dsg-rich] Load test
Marc McMullen
- [Dsg-rich] ECI reply about shipping of RICH mirrors
Barbara Monti
- [Dsg-rich] RICH tasks for 10/19/2017
Tyler Lemon
- [Dsg-rich] RICH PR's
Peter Bonneau
- [Dsg-rich] Shipping authorizations for RICH spherical mirrors
Tyler Lemon
- [Dsg-rich] USB feedthrough
Marco Contalbrigo
- [Dsg-rich] load test of stiffening tool complete
Tyler Lemon
- [Dsg-rich] RICH PR 373327P
Peter Bonneau
- [Dsg-rich] Truck
Marc McMullen
- [Dsg-rich] second line ran for air-cooling; unistrut and plastic gathered for aerogel assembly tent
Tyler Lemon
- [Dsg-rich] RICH tasks scheduled for October 23, 2017
Tyler Lemon
- [Dsg-rich] ethyl alcohol received over weekend at desk
Tyler Lemon
- [Dsg-rich] Fwd: Pictures of Load Test fro RICH BTHLD.
Marc McMullen
- [Dsg-rich] Pictures of Load Test fro RICH BTHLD.
Marc McMullen
- [Dsg-rich] Hall B - RICH Experiment - Air compressor condensate drain piping - Cost to install
Tyler Lemon
- [Dsg-rich] black 1/4" OD gas line for RICH nitrogen
Tyler Lemon
- [Dsg-rich] Stiffening tool load test 1
Amanda Hoebel
- [Dsg-rich] Stiffening tool load test 2
Amanda Hoebel
- [Dsg-rich] Stiffening tool load test 3
Amanda Hoebel
- [Dsg-rich] Stiffening tool assembly
Amanda Hoebel
- [Dsg-rich] Suggestions for RICH air-cooling
Tyler Lemon
- [Dsg-rich] holes
Marco Mirazita
- [Dsg-rich] air filter
Amrit Yegneswaran
- [Dsg-rich] R3 DC Strongback
Marc McMullen
- [Dsg-rich] Hall B - RICH Experiment - Air Compressor Condensate Drain - Proposed piping system
Tyler Lemon
- [Dsg-rich] ECI pick-up notice for INFN RICH mirrors - 2 coated mirrors ready for pick-up 10/26
Barbara Monti
- [Dsg-rich] Sensors
Marco Contalbrigo
- [Dsg-rich] R3 Strongback
Marc McMullen
- [Dsg-rich] RICH rotation to vertical tomorrow, 10/26/17, at 9:00AM
Tyler Lemon
- [Dsg-rich] Fwd: Re: RICH manifold nylon tubing
Marc McMullen
- [Dsg-rich] three partial 3-cm thick aerogel tiles received, stored in small drybox in EEL 121 gowning room
Tyler Lemon
- [Dsg-rich] ECI pick-up notice for INFN RICH mirrors - 4 coated mirrors ready for pick-up 10/30
Barbara Monti
- [Dsg-rich] RICH hardware interlock cRIO rewired to allow N2 volume sensors to be installed
Tyler Lemon
- [Dsg-rich] Cooling manifold
Marc McMullen
- [Dsg-rich] load test report
Marc McMullen
- [Dsg-rich] PPE during materials handling in EEL 124
Marc McMullen
- [Dsg-rich] condition of EEL 124 cleanroom
Tyler Lemon
- [Dsg-rich] RICH N2 volume sensors connected to cRIO, keyed override switch installed
Tyler Lemon
- [Dsg-rich] Nitrogen test in the RICH
Marco Mirazita
- [Dsg-rich] Status of RICH mirrors shipping arrangements?
Tyler Lemon
- [Dsg-rich] N2 Supply
Marc McMullen
- [Dsg-rich] odds & ends
Amrit Yegneswaran
- [Dsg-rich] mirror shipment from eci
Amrit Yegneswaran
- [Dsg-rich] RICH hardware interlocks enabled
Tyler Lemon
Last message date:
Tue Oct 31 16:10:59 EDT 2017
Archived on: Tue May 19 17:25:36 EDT 2020
This archive was generated by
Pipermail 0.09 (Mailman edition).